Container
- Type and size
- Container number
- Loaded status
- Seal information

Container transport
Coordinate containerized cargo by confirming container type, cargo weight, handling equipment, pickup access and delivery readiness before vehicle placement.

Container profile
A container movement must account for the container, cargo inside it, total weight and the equipment available at both ends.
The same physical container can create a different vehicle and site plan depending on its condition.
| Consideration | Loaded container | Empty container |
|---|---|---|
| Weight | Cargo and container gross weight | Tare weight |
| Documents | Cargo and container documents | Container movement details |
| Handling | Cargo stability and seal considered | Empty lift and repositioning |
| Vehicle | Payload and configuration critical | Configuration and availability |
Document size, type, number, status and weight.
Confirm how the unit will be lifted or placed at both ends.
Review payload, configuration, route and availability.
Align vehicle, documents and handling equipment.
Coordinate route, arrival and site entry.
Complete any empty return or repositioning instruction.
Questions answered
It helps assess payload suitability, equipment and transport feasibility.
The responsibility should be established during scope review for both pickup and delivery.
Potentially, subject to container details, route, equipment and availability.
Yes. They affect placement, waiting, handling coordination and delivery planning.
Plan the movement
Share the route, cargo profile, timing and handling requirements. NARSIK will review the shipment before recommending the next step.